We're always striving to improve our facilties for our members. Here are some planned improvements, and works in progress!
2022 (April-May) Pool resurfacing
- All coping stones replaced.
- All existing plaster removed; new plaster installed.
- Racing lane tiles replaced.
- Waterline tiles replaced.
- Skimmers replaced.
- Any deteriorated or damaged area of the pool beam repaired.
- A stair entry area added into the pool deck to not interfere with racing lanes. The total size of the area is approximately 5' x 14'